Regional
11:59 am
Sat December 1, 2012

Tuesday Overnight Closure Of I-25

LAS CRUCES – Update: The New Mexico Department of Transportation (NMDOT) and A.S. Horner continue work on the I-10/ I-25 System Interchange, with detours advising motorists of lane restrictions and detours.

There will be one (1) FULL overnight closure on I-25 for Tuesday December 4th from 9:00 p.m. until 6:00 a.m.. Please use detours as posted throughout the project.

The NMDOT has the following alerts for this project, and encourage motorists to exercise caution through the construction zone due to speed reductions, width restrictions, heavy equipment, and construction personnel within the work area.

Contractor: A.S. Horner, Inc.

  • I-25 Southbound (SB) & I-25 Northbound (NB): Traffic is reduced to one-lane in each direction.  Speed limit is reduced to 45 MPH. Traffic will be switching lanes periodically throughout this phase for reconstruction of the driving lanes on I-25 NB and SB.
  • I-10 Eastbound (EB) & Westbound (WB):  Traffic is reduced to one-lane in each direction.  Traffic has been switched to the newly constructed eastbound lanes. Speed limit is reduced to 45 MPH. 
  • Las Alturas has been re-aligned (east of old alignment). Roadway widths remain restricted for construction of the MSE retaining wall.
  • Stern Drive has been re-aligned (west of old alignment) for construction of the flyover ramp. Starting Monday December 3rd Stern will be reduced to one-lane utilizing TEMPORARY traffic signals and flagging. This operation will be in effect for approximately 6 weeks.

This project will be progressing in stages where updates will be posted on the NMDOT home page http://www.dot.state.nm.us/InterchangeI10-I25.html  and on the road advisory site at www.NMroads.com.